Delays in MET model production due to ECMWF incidence
Incident Report for MET Norway
Resolved
An anomaly in the ECMWF global data production has caused delays in the MET model production. Data flow has resumed but many of our models runs are delayed today.
Posted Jun 16, 2021 - 12:17 CEST
This incident affected: thredds.met.no (MEPS deterministic, MEPS deterministic post processed, MEPS ensemble, MET Arome Arctic deterministic).